Welland River Floodplain Mapping
We thank all participants! Consultation process has now concluded.
The Niagara Peninsula Conservation Authority is in the process of updating floodplain mapping for the Welland River.
An important part of this process is engaging our community, particularly those who live in the vicinity of the Welland River.
HOW TO PROVIDE FEEDBACK:
Please read the Welland River Floodplain Mapping Update Draft Report found on the right hand side, and send feedback by:
1. Completing form found below
2. Attending a Town Hall Meeting (no registration required)
3. Dropping off written comment at 250 Thorold Road West in Welland
The Niagara Peninsula Conservation Authority is in the process of updating floodplain mapping for the Welland River.
An important part of this process is engaging our community, particularly those who live in the vicinity of the Welland River.
HOW TO PROVIDE FEEDBACK:
Please read the Welland River Floodplain Mapping Update Draft Report found on the right hand side, and send feedback by:
1. Completing form found below
2. Attending a Town Hall Meeting (no registration required)
3. Dropping off written comment at 250 Thorold Road West in Welland
Guest Book
Thank you for your interest in the Welland River Floodplain Mapping. A comprehensive consultation and engagement process will help keep residents informed and provide an opportunity for participation and feedback.
Before providing your feedback here, please ensure you have read the Welland River Floodplain Mapping Update Draft Report found on the main page.
Important Documents:
- Welland River Floodplain Mapping Update- Draft Report & Maps (142 MB) (pdf)
- Welland River Floodplain Mapping Update Town Hall 1 Summary Report - May 10, 2016 (550 KB) (pdf)
- WellandRiver Floodplain Mapping - Town Hall Meeting #2 Presentation - June 2016 (20.7 MB) (pdf)
- Welland River Floodplain Mapping Update Town Hall 2 Summary Report - Sept. 2016 (526 KB) (pdf)
Key Dates
-
October 02 2019
-
October 10 2019
-
October 24 2019
-
October 29 2019
Project Timeline
-
May 2015
Welland River Floodplain Mapping has finished this stageThe engineering firm WSP Canada (formally the MMM Group) was retained to update the 1985 Welland River Floodplain maps.
-
May 2015
Welland River Floodplain Mapping has finished this stageThe engineering firm WSP Canada (formally the MMM Group) was retained to update the 1985 Welland River Floodplain maps.
-
May 2015
Welland River Floodplain Mapping has finished this stageThe engineering firm WSP Canada (formally the MMM Group) was retained to update the 1985 Welland River Floodplain maps.
-
May 2015
Welland River Floodplain Mapping has finished this stageThe engineering firm WSP Canada (formally the MMM Group) was retained to update the 1985 Welland River Floodplain maps.
-
February 2016
Welland River Floodplain Mapping has finished this stageThe first round of Town Hall meetings were held at four locations in the watershed (Niagara Falls, Welland, Wellandport, Caistor Center) to inform the public of the beginning of this new study and to solicit public input and concerns prior to undertaking any technical work.
-
February 2016
Welland River Floodplain Mapping has finished this stageThe first round of Town Hall meetings were held at four locations in the watershed (Niagara Falls, Welland, Wellandport, Caistor Center) to inform the public of the beginning of this new study and to solicit public input and concerns prior to undertaking any technical work.
-
February 2016
Welland River Floodplain Mapping has finished this stageThe first round of Town Hall meetings were held at four locations in the watershed (Niagara Falls, Welland, Wellandport, Caistor Center) to inform the public of the beginning of this new study and to solicit public input and concerns prior to undertaking any technical work.
-
February 2016
Welland River Floodplain Mapping has finished this stageThe first round of Town Hall meetings were held at four locations in the watershed (Niagara Falls, Welland, Wellandport, Caistor Center) to inform the public of the beginning of this new study and to solicit public input and concerns prior to undertaking any technical work.
-
June 2016
Welland River Floodplain Mapping has finished this stageThe second round of Town Hall meetings were held again in Niagara Falls, Welland, Wellandport, Caistor Center to provide a technical understanding of the project, discuss the project’s progress, and to respond to any questions and concerns of the public.
-
June 2016
Welland River Floodplain Mapping has finished this stageThe second round of Town Hall meetings were held again in Niagara Falls, Welland, Wellandport, Caistor Center to provide a technical understanding of the project, discuss the project’s progress, and to respond to any questions and concerns of the public.
-
June 2016
Welland River Floodplain Mapping has finished this stageThe second round of Town Hall meetings were held again in Niagara Falls, Welland, Wellandport, Caistor Center to provide a technical understanding of the project, discuss the project’s progress, and to respond to any questions and concerns of the public.
-
June 2016
Welland River Floodplain Mapping has finished this stageThe second round of Town Hall meetings were held again in Niagara Falls, Welland, Wellandport, Caistor Center to provide a technical understanding of the project, discuss the project’s progress, and to respond to any questions and concerns of the public.
-
June 2016
Welland River Floodplain Mapping has finished this stageIn a separate project, Dillon Consulting was retained to update the NPCA’s Development Policy document.
-
June 2016
Welland River Floodplain Mapping has finished this stageIn a separate project, Dillon Consulting was retained to update the NPCA’s Development Policy document.
-
June 2016
Welland River Floodplain Mapping has finished this stageIn a separate project, Dillon Consulting was retained to update the NPCA’s Development Policy document.
-
June 2016
Welland River Floodplain Mapping has finished this stageIn a separate project, Dillon Consulting was retained to update the NPCA’s Development Policy document.
-
November 2016
Welland River Floodplain Mapping has finished this stageThe NPCA Board directed that the Welland River Floodplain Mapping Update project be put on hold until the NPCA’s Development Policy document was completed so the public could provide input on the NPCA’s new Flood Hazard Policies. -
November 2016
Welland River Floodplain Mapping has finished this stageThe NPCA Board directed that the Welland River Floodplain Mapping Update project be put on hold until the NPCA’s Development Policy document was completed so the public could provide input on the NPCA’s new Flood Hazard Policies. -
November 2016
Welland River Floodplain Mapping has finished this stageThe NPCA Board directed that the Welland River Floodplain Mapping Update project be put on hold until the NPCA’s Development Policy document was completed so the public could provide input on the NPCA’s new Flood Hazard Policies. -
November 2016
Welland River Floodplain Mapping has finished this stageThe NPCA Board directed that the Welland River Floodplain Mapping Update project be put on hold until the NPCA’s Development Policy document was completed so the public could provide input on the NPCA’s new Flood Hazard Policies. -
September 2018
Welland River Floodplain Mapping has finished this stageThe updated NPCA Development Policy document (complete with the revised Flood Hazard Policies) was approved by the NPCA Board of Directors.
-
September 2018
Welland River Floodplain Mapping has finished this stageThe updated NPCA Development Policy document (complete with the revised Flood Hazard Policies) was approved by the NPCA Board of Directors.
-
September 2018
Welland River Floodplain Mapping has finished this stageThe updated NPCA Development Policy document (complete with the revised Flood Hazard Policies) was approved by the NPCA Board of Directors.
-
September 2018
Welland River Floodplain Mapping has finished this stageThe updated NPCA Development Policy document (complete with the revised Flood Hazard Policies) was approved by the NPCA Board of Directors.
-
May 2019
Welland River Floodplain Mapping has finished this stageThe Final Draft of the Welland River Floodplain Mapping Update Study was reviewed and approved by NPCA staff.
-
May 2019
Welland River Floodplain Mapping has finished this stageThe Final Draft of the Welland River Floodplain Mapping Update Study was reviewed and approved by NPCA staff.
-
May 2019
Welland River Floodplain Mapping has finished this stageThe Final Draft of the Welland River Floodplain Mapping Update Study was reviewed and approved by NPCA staff.
-
May 2019
Welland River Floodplain Mapping has finished this stageThe Final Draft of the Welland River Floodplain Mapping Update Study was reviewed and approved by NPCA staff.
-
June 2019
Welland River Floodplain Mapping has finished this stageThe NPCA’s Floodplain Advisory Committee recommended to the NPCA Board that staff be directed to release the Final Draft of the Welland River Floodplain Mapping Update Study to the public for comment and proceed to schedule the final round of Town Hall meetings at the same four previous venues.
-
June 2019
Welland River Floodplain Mapping has finished this stageThe NPCA’s Floodplain Advisory Committee recommended to the NPCA Board that staff be directed to release the Final Draft of the Welland River Floodplain Mapping Update Study to the public for comment and proceed to schedule the final round of Town Hall meetings at the same four previous venues.
-
June 2019
Welland River Floodplain Mapping has finished this stageThe NPCA’s Floodplain Advisory Committee recommended to the NPCA Board that staff be directed to release the Final Draft of the Welland River Floodplain Mapping Update Study to the public for comment and proceed to schedule the final round of Town Hall meetings at the same four previous venues.
-
June 2019
Welland River Floodplain Mapping has finished this stageThe NPCA’s Floodplain Advisory Committee recommended to the NPCA Board that staff be directed to release the Final Draft of the Welland River Floodplain Mapping Update Study to the public for comment and proceed to schedule the final round of Town Hall meetings at the same four previous venues.
-
August 2019
Welland River Floodplain Mapping is currently at this stageThe NPCA Board directed staff to release the Final Draft of the Welland River Floodplain Mapping Update Study to the public for comment and proceed to schedule the final round of Town Hall meetings at the same four previous venues.
-
August 2019
Welland River Floodplain Mapping has finished this stageThe NPCA Board directed staff to release the Final Draft of the Welland River Floodplain Mapping Update Study to the public for comment and proceed to schedule the final round of Town Hall meetings at the same four previous venues.
-
August 2019
Welland River Floodplain Mapping has finished this stageThe NPCA Board directed staff to release the Final Draft of the Welland River Floodplain Mapping Update Study to the public for comment and proceed to schedule the final round of Town Hall meetings at the same four previous venues.
-
August 2019
Welland River Floodplain Mapping has finished this stageThe NPCA Board directed staff to release the Final Draft of the Welland River Floodplain Mapping Update Study to the public for comment and proceed to schedule the final round of Town Hall meetings at the same four previous venues.
For further discussion regarding project:
-
SM
Phone 905-788-3135 x 231 Email smiller@npca.ca
Hi Scov, thank you for leaving this comment. Unfortunately, we do not have your email address on file. We do have maps that you can review. Please reach out to Steve Miller Senior Manager, Water Resources at smiller@npca.ca and he will be able to provide you with these. If you are unsure, we do recommend you attend an info session.
Do you have maps of the study are that I could preview to see if we are located in the buffer study zone or not? In 2016 the buffer area was 500m. Is it still? Our property has wetland significance but we are outside of the buffer zone by Morris Road between Carl Road and Young Roads in Niagara Falls. Does this Welland River Floodplain Plan include our property? Do we need to attend an info session? Thanks